Traductor
Units converter
Advertising
Quotes on line
2014 CONEXPO-CON/AGG
2014 World Crane and Transport Summit
2014 International Cranes and Transport Latin America
APEX 2014


   Search News
RSS
CAF structures highway concessions while Bogotá plans new transport tenders (Colombia)
2010-02-05

The Andean Development Corporation (CAF) is structuring urban highway concession projects in Colombian capital Bogotá, according to the country's mobility secretary, Fernando Álvarez.   CAF is carrying out a prefeasibility study to determine which model should be used to impleme...

 
Prointec to present Oruro dry port design next week (Bolivia)
2010-02-05

Spanish firm Prointec will present the final design of a dry port in Bolivia's Oruro department to government authorities next week, the company's consultancy director, Javier Fernández, told BNamericas.   The final report is scheduled to be approved on March 30, after which the Oruro ...

 
Cuzco flood damage totals US$238mn (Peru)
2010-02-05

The severe floods that hit Peru's Cuzco region last week caused damage totaling 680mn soles (US$238mn), according to regional governor Hugo Gonzales Sayán.   Having evaluated the costs of the disaster, local and regional government authorities will now begin carrying out reconstruction...

 
Environmental concerns led public hearings on bullet train (Brasil)
2010-02-04

Environmental issues reigned at the public hearings on the São Paulo-Rio-Campinas bullet train, according to Brazil's national ground transport agency (ANTT) supervisor Hélio Mauro França.   The latest hearings ran from December 18 to January 29.   The authority ha...

 
Mujica to concession AFE lines and services (Uruguay)
2010-02-04

Uruguayan president-elect José Mujica will continue the current government's plan to concession part of state-owned rail firm AFE's railways and services, an official from Mujica's team told BNamericas.   Mujica and members of his team have met with current authorities to discuss a num...

 
Roundup: Caaguazú, Asunción paving, Santa María bridges, Ruta 8 resurfacing (Paraguay)
2010-02-04

Paraguayan President Fernando Lugo has inaugurated the start of paving work on a 22km stretch of highway linking the Carayao and Cleto Romero communities in Caaguazú department, the presidential website reported.   Work is being carried out by local firm Inducon, and is expected to be ...

 
EPA awards Arica-Visviri rail tender without detailed engineering studies (Chile)
2010-02-04

Chile's state-owned Arica port administrator EPA has awarded a rail rehabilitation tender to the Chilean branch of Spanish firm Comsa, Comsa de Chile, even though the detailed engineering studies for the project have not been carried out yet, an official from state-owned rail firm EFE told BNamerica...

 
Santos port to triple by 2025, modes of transport to change balance (Brasil)
2010-02-04

Brazil's special ports department (SEP) head Pedro Brito presented Santos port's 15-year expansion plan which is based on the results of a study carried out by IDB, news service Agência Estado reported.   According to the plan, the port will triple in size by 2025. Container handling wi...

 
   pagina: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196